avalancheMM
Member
Finally getting around to posting a few pics, structure and concrete have been done for about 6 weeks, 100A electrical and water supply are in, bathroom is framed, waiting to get septic holding tank installed, and complete bathroom electrical, probably next weekend. WIll post pics of LED lighting and interior soon!! Thanks for lookin'!
Regards
[URL=http://s694.photobucket.com/user/avalancheMM/media/photo%20Shop%203.jpg.html]
[/URL]
[/URL][/IMG]
[/URL][/IMG]
[/URL][/IMG]
Regards
[URL=http://s694.photobucket.com/user/avalancheMM/media/photo%20Shop%203.jpg.html]
[/URL]