brookscooper
Well-known member
- Joined
- Jul 27, 2009
- Messages
- 71
So, I've looked and searched. If I'm search deficient and this has been covered a million times then chide me well.
Here are my questions:
I'm going to use a 2 part epoxy - probably epoxy coat but I doubt brand matters for these questions:
1) The slab will be brand new - what surface texture should I have the concrete guys give me to make epoxy application easiest?
2) It's a 3" slab on a metal deck - it's the main slab above a basement. There will be NO water curing out of the slab from below - only above. How long should I / must I wait to coat with epoxy?
Thanks all!
Here are my questions:
I'm going to use a 2 part epoxy - probably epoxy coat but I doubt brand matters for these questions:
1) The slab will be brand new - what surface texture should I have the concrete guys give me to make epoxy application easiest?
2) It's a 3" slab on a metal deck - it's the main slab above a basement. There will be NO water curing out of the slab from below - only above. How long should I / must I wait to coat with epoxy?
Thanks all!