So my 24'x44' slab was poured a few days ago. They used compacted gravel, a vapor barrier, rebar in the foundation block, and keyway expansion joints in lieu of saw cuts. It looked pretty good but I'm very picky and kind of a perfectionist. I'm also not a concrete guy so I don't know when/if I should speak up but I've already noticed that where the keyways were placed, the concrete is cracking. Is this normal? I know that is the point of the joints but should it be cracking this early? Also it seems the that expansion joints are a 1/16" to 1/32" above the rest of the pour. They don't stick up over the concrete but I can rub my hand over them and feel where they are placed. I can also see the very center of the metal. Is this all normal?

I plan to rust bullet the floor before I move in. Will the cracks be an issue when I do that or will they fill in okay?

Thanks in advance for anyone that can help put my mind at ease. I think I'm just being way too picky but I wanted to double check.
 

Attachments

  • 20150817_195257.jpg
    20150817_195257.jpg
    141 KB · Views: 184
  • 20150817_195704.jpg
    20150817_195704.jpg
    131 KB · Views: 174
  • 20150818_170006.jpg
    20150818_170006.jpg
    152 KB · Views: 178
  • 20150818_170026.jpg
    20150818_170026.jpg
    134.8 KB · Views: 197
  • 20150818_170438.jpg
    20150818_170438.jpg
    137.1 KB · Views: 202
  • 20150822_184734.jpg
    20150822_184734.jpg
    124.9 KB · Views: 207
To avoid these ads, REGISTER NOW!

boobag

Well-known member
Joined
Aug 15, 2010
Messages
397
concrete actually shrinks a little as it dries. so thats why you see the cracking, and it occurs controlled along the keyway expansion joints. you have to give concrete somewhere to crack. either by expansion joint, saw cutting, keyway, etc. the worst is to get a random crack in a slab.
it looks like they did a nice job from the pics.
 
OP
J

jeopardy98

Well-known member
Joined
May 11, 2015
Messages
587
Location
Prince George, VA
Thanks. I know that it has to crack somewhere I just didn't realize it wouldn't happen so soon. Also after I posted this I went looking for similar threads and found the guy who is in MUCH worse shape than I.

The keyway being visible down the middle like that is okay? Nothing I should worry about? Also can I just put the RB over the cracks when it is time?
 

boobag

Well-known member
Joined
Aug 15, 2010
Messages
397
you could maybe smooth out the cracks before epoxy. could even run a diamond saw blade down the crack to open it up and even it out, then fill with a sealant?
i'd wait a little and see how much those cracks grow. if any.
 

WarDamnEagle

Well-known member
Joined
Mar 13, 2009
Messages
208
Location
Auburn
Keeping the concrete wet for 2 weeks will help minimize shrinkage cracks. I always put a sprinkler on immediately after it's hard enough to walk on. Having said that, you will still get shrinkage cracks.
 

stikman56

Well-known member
Joined
Jun 12, 2014
Messages
3,127
Keeping the concrete wet for 2 weeks will help minimize shrinkage cracks. I always put a sprinkler on immediately after it's hard enough to walk on. Having said that, you will still get shrinkage cracks.

Yeah, keep it wet is the key. I sprayed our foundation down between the time it was poured and the framers getting started which was a week and half or more. It helped I'm sure.
 
To avoid these ads, REGISTER NOW!
OP
J

jeopardy98

Well-known member
Joined
May 11, 2015
Messages
587
Location
Prince George, VA
Mine was only 2 days. Then 1 day of framing led me to my current status.

f56cb988f194be5573594912a9a1ea9e.jpg
 

Bates

Member
Joined
Aug 13, 2015
Messages
5
Mesh is important to keep a floor from cracking as well. But unfortunately it's too late for you. Styrofoam around the outside 2' would have been good to keep the frost from creeping in as well.
 
OP
J

jeopardy98

Well-known member
Joined
May 11, 2015
Messages
587
Location
Prince George, VA
They used that expansion board around the perimeter. I really only have that one crack right on the keyway and it's less than a quarter's width. I'm sure it just came from not being watered while it dried.
 

boobag

Well-known member
Joined
Aug 15, 2010
Messages
397
Mesh is important to keep a floor from cracking as well. But unfortunately it's too late for you. Styrofoam around the outside 2' would have been good to keep the frost from creeping in as well.

mesh doesnt prevent cracking. it just sorta holds it together if it does.
using a lot of rebar will help, but then thats a big add-on expense.

They used that expansion board around the perimeter. I really only have that one crack right on the keyway and it's less than a quarter's width. I'm sure it just came from not being watered while it dried.

your floor cracked on an expansion joint.
i think why it shows up a bit worse is that your concrete finishers floated a little concrete over the top of the expansion joint, instead of even to the top. not a big deal though.
 

Ponchoguy

Banned
Joined
Jul 27, 2014
Messages
3,399
They used that expansion board around the perimeter. I really only have that one crack right on the keyway and it's less than a quarter's width. I'm sure it just came from not being watered while it dried.

Propex makes something called Fibermesh which helps stop that. My coworkers father is a mason and when he knew I was doing a driveway, he told me to make sure I spec it in my mix, which I did.

I did get some sinking (65+ ft driveway, 8" thick concrete, truck had to make like three trips back and forth), but I will deal with this in an appropriate way.
 

greran

Member
Joined
Mar 29, 2011
Messages
14
Location
Grande Prairie, Alberta, Canada
the slab has cracked exactly where it's suppose to with that system (i believe called zip-strip..) I've had my slab for close to 3 years now and haven't seen any new cracks form or have the cracks getting any bigger over the zip strips.

Come coating time, like others have said, a little epoxy filler and you should be fine, :thumbup:
 