jeopardy98
Well-known member
So my 24'x44' slab was poured a few days ago. They used compacted gravel, a vapor barrier, rebar in the foundation block, and keyway expansion joints in lieu of saw cuts. It looked pretty good but I'm very picky and kind of a perfectionist. I'm also not a concrete guy so I don't know when/if I should speak up but I've already noticed that where the keyways were placed, the concrete is cracking. Is this normal? I know that is the point of the joints but should it be cracking this early? Also it seems the that expansion joints are a 1/16" to 1/32" above the rest of the pour. They don't stick up over the concrete but I can rub my hand over them and feel where they are placed. I can also see the very center of the metal. Is this all normal?
I plan to rust bullet the floor before I move in. Will the cracks be an issue when I do that or will they fill in okay?
Thanks in advance for anyone that can help put my mind at ease. I think I'm just being way too picky but I wanted to double check.
I plan to rust bullet the floor before I move in. Will the cracks be an issue when I do that or will they fill in okay?
Thanks in advance for anyone that can help put my mind at ease. I think I'm just being way too picky but I wanted to double check.
