Had my slab poured today for my 30 x 40. Contractor called me and said the concrete delivered was air entrained although he specifically told them what he wanted. Concrete provider acknowledges this and has taken full responsibility for the pour.
They have offered 2 things:
1) provide concrete/labor charges to pour another 4" slab on top of this one.
2) cut out all the bad areas completely and patch these areas with new pour
then epoxy coat the whole floor (no charge). Also refund all money for
first pour.
Concrete looks pretty bad...Lots of blistering that will defiantly delaminate and pop. Also quite a few areas of scaling. What is the best course of action here. Going another 4 in. wont affect build at all, no framing done yet.
Never heard of pouring a slab on top of another. Is this going to be a quality repair or a band-aid.
Any help is greatly appreciated.
They have offered 2 things:
1) provide concrete/labor charges to pour another 4" slab on top of this one.
2) cut out all the bad areas completely and patch these areas with new pour
then epoxy coat the whole floor (no charge). Also refund all money for
first pour.
Concrete looks pretty bad...Lots of blistering that will defiantly delaminate and pop. Also quite a few areas of scaling. What is the best course of action here. Going another 4 in. wont affect build at all, no framing done yet.
Never heard of pouring a slab on top of another. Is this going to be a quality repair or a band-aid.
Any help is greatly appreciated.