I am having a new 6" 5000psi slab put in the garage Monday after the orinigal slab is removed. I am going to have quartz applied. The schedule looks like we will have the quartz installed about 49 days after the slab is poured.
I will have a vapor barrier installed under the slab. Is a liquid vapor barrier necessary between the slab and quartz?
I like the texture of the quartz in the sample I was provided. Is it easy to sweep it? Creepers roll around ok?
I will have a vapor barrier installed under the slab. Is a liquid vapor barrier necessary between the slab and quartz?
I like the texture of the quartz in the sample I was provided. Is it easy to sweep it? Creepers roll around ok?