Recently finished our 30x50 workshop, now for concrete.
Before the the bldg was erected (on 18 24" dia x 5' piers), I rented a compactor for the dirt guy who wanted an 4 times what the roller cost me, so I rented it myself & rolled it until dark each day after they left - to their credit, they did roll a few lifts during the daytime.
I've been building industrial facilities for years, even spent time doing every aspect of concrete work (about 30 years ago), so I know what I want, however I'm having trouble finding the right contractor, so I'm considering doing this with my two teenage sons.
A few issues;
1) Any concerns about breaking this up into 4 pours ~10 CY per pour? Anything over 10 CY and I think we'll need more help - I can get a neighbor or two to pitch in.
2) The door is 12x12 and I'm waiting for confirmation on the height of the concrete trucks, if it's close, I could dig out a bit under the door and place that section last. Any other ideas? Buggy / pump? Might need more labor.
3) Will I get a decent finish with a bull float? Or should I rent a power trowel? I do plan on a finish later - undecided between the epoxy/poly/densifying sealer, likely the later due to funds.
4) Any suggestions on how much a finishing crew would cost? I'm pretty set on doing the leveling, visqueen & rebar work myself. I've seen some pretty messed up concrete over the years on the industrial side of things, so I know I want this done right.
5) Think I'm getting in over my head? It'll be a simple workshop - vehicles, woodworking, welding, etc... No major loads or activities.
Appreciate ya'lls thoughts, been lurking for years around here and my project is finally underway.
Before the the bldg was erected (on 18 24" dia x 5' piers), I rented a compactor for the dirt guy who wanted an 4 times what the roller cost me, so I rented it myself & rolled it until dark each day after they left - to their credit, they did roll a few lifts during the daytime.
I've been building industrial facilities for years, even spent time doing every aspect of concrete work (about 30 years ago), so I know what I want, however I'm having trouble finding the right contractor, so I'm considering doing this with my two teenage sons.
A few issues;
1) Any concerns about breaking this up into 4 pours ~10 CY per pour? Anything over 10 CY and I think we'll need more help - I can get a neighbor or two to pitch in.
2) The door is 12x12 and I'm waiting for confirmation on the height of the concrete trucks, if it's close, I could dig out a bit under the door and place that section last. Any other ideas? Buggy / pump? Might need more labor.
3) Will I get a decent finish with a bull float? Or should I rent a power trowel? I do plan on a finish later - undecided between the epoxy/poly/densifying sealer, likely the later due to funds.
4) Any suggestions on how much a finishing crew would cost? I'm pretty set on doing the leveling, visqueen & rebar work myself. I've seen some pretty messed up concrete over the years on the industrial side of things, so I know I want this done right.
5) Think I'm getting in over my head? It'll be a simple workshop - vehicles, woodworking, welding, etc... No major loads or activities.
Appreciate ya'lls thoughts, been lurking for years around here and my project is finally underway.