BirdHunter
Well-known member
New Post Truss 30x50
New 100amp panel will be 50 feet from Primary service at the house.
8' grounding rod was driven prior to concrete and tied into rebar.
18" trench has been dug from below the meter to the new shop
Main panel in the house is full and located directly behind the meter inside the garage.
I'm outside city limits but still want to do this the right way.
Here's my plan.
Double lug the primary service on the main panel and route to a disconnect on the outside wall of the house next to the meter.
Run 3 wire #3 direct burial cable from the disconnect, through the trench to the building and up into the new 100amp panel.
Here is my question.
Since the primary coming from the utility has no ground is the 3 wire #3 acting as a primary to the new building? In which case I just ground the new panel to the rod?
Or do I still need to run a ground back through the trench to the main panel ?
New 100amp panel will be 50 feet from Primary service at the house.
8' grounding rod was driven prior to concrete and tied into rebar.
18" trench has been dug from below the meter to the new shop
Main panel in the house is full and located directly behind the meter inside the garage.
I'm outside city limits but still want to do this the right way.
Here's my plan.
Double lug the primary service on the main panel and route to a disconnect on the outside wall of the house next to the meter.
Run 3 wire #3 direct burial cable from the disconnect, through the trench to the building and up into the new 100amp panel.
Here is my question.
Since the primary coming from the utility has no ground is the 3 wire #3 acting as a primary to the new building? In which case I just ground the new panel to the rod?
Or do I still need to run a ground back through the trench to the main panel ?
Last edited: