Quick one which seems to have varying responses. In a basement garage I'm running NM cable (14-2 and 12-2 most commonly) for lights and power. I generally try to use the pre-existing drilled holes in joists which already have NM cable for the remainder of the home. How many NM cables are allowed per hole (generally 1" or 7/8" holes). Responses vary from as many as will fit without physical damage (ie. they can be pulled through fairly easily) to only 1 cable per hole. I think 1-2 cables is silly as drilling hundreds of new joist holes is not ideal for structural integrity.
Home was wired in the 80's and done well but some is clearly not to code (eg. no running boards for some 12-2 cable stapled directly to bottom of joists).
Home was wired in the 80's and done well but some is clearly not to code (eg. no running boards for some 12-2 cable stapled directly to bottom of joists).