Had the footers and stemwall poured. Gonna have to wait to get floor and walls up. Been getting comments and concerns about protecting the concrete through the winter from water absorption and possible freeze. What are some suggestions for protecting the top and sides? As can be seen, the top is rough and the sides have a good deal of pitting. Any suggestions and experiences would be appreciated. Thanks.
