Number 57 gravel crushed enough?

plout99

Well-known member
Joined
Apr 8, 2012
Messages
288
Location
Ohio
Getting ready to fill for my shop floor. Limestone is not a local material has to be trucked in, it's available for $26 a ton in number 57 washed. I can get local queried 57 washed for $12 a ton. I will be using 50 tons so the local gravel has some decent savings. The quarry said its crushed just concerned its not as angular as limestone I have used in the past. Will I have any issues consolidating it? I have a jumping jack and a plate compactor to use on it in multiple lifts.
 

Attachments

  • IMG_2245.jpg
    IMG_2245.jpg
    112.8 KB · Views: 119
To avoid these ads, REGISTER NOW!

brownbagg

Well-known member
Joined
Mar 20, 2006
Messages
5,208
we use a lot of 57, its a 3/4 rock with no fines, great for wet area, its doesnt compact. just keeps rolling around, but that itself is not a problem. if you want cheap, get crush concrete
 

mcbane

Well-known member
Joined
Jul 23, 2017
Messages
794
Location
California
It appears that aggregate numbers are regional, just like Chinese food. You might like #17 (Mongolian beef) in one place but hate it in another (prawns in mayonnaise).

In any case, you want to use vibratory plate for gravel and not jumping jack.


Sent from my iPhone using Tapatalk
 

Pluribus

Well-known member
Joined
Dec 16, 2012
Messages
2,143
Location
Skagit County, WA
Getting ready to fill for my shop floor. Limestone is not a local material has to be trucked in, it's available for $26 a ton in number 57 washed. I can get local queried 57 washed for $12 a ton. I will be using 50 tons so the local gravel has some decent savings. The quarry said its crushed just concerned its not as angular as limestone I have used in the past. Will I have any issues consolidating it? I have a jumping jack and a plate compactor to use on it in multiple lifts.

we use a lot of 57, its a 3/4 rock with no fines, great for wet area, its doesnt compact. just keeps rolling around, but that itself is not a problem. if you want cheap, get crush concrete

For a shop floor, whether or not it will have a floor poured over it someday, I think I'd want something that would compact & key together better. Price might be attractive, but if it doesn't do the job, it could cost you big time in the long run. Hopefully someone familiar with your local soil conditions will chime in with a specific recommendation, or maybe you can ask around your circle of acquaintances to see what's typically used there.
 

theoldwizard1

Well-known member
Joined
Feb 22, 2011
Messages
43,559
Location
SE MI
The quarry said its crushed just concerned its not as angular as limestone I have used in the past. Will I have any issues consolidating it? I have a jumping jack and a plate compactor to use on it in multiple lifts.

That is NOT crushed ! It will not compact well.
 

WNYflyer

Well-known member
Joined
Sep 13, 2009
Messages
2,132
Location
Lockport, NY
Also look into ODOT 304 material which is used for compacted backfill under roads and is also often used under slabs on grade. Don't know how that would worked out though if you are not topping it with concrete or asphalt.
 
To avoid these ads, REGISTER NOW!

Dzlpete

Well-known member
Joined
Dec 23, 2017
Messages
96
Location
Williamstown, MA
If it is inside concrete walls, and the soil/ gravel under is well drained and solid, just fill with the inexpensive stuff.
It is stone, it will not compact any real amount.
 

madison069

Well-known member
Joined
Nov 5, 2010
Messages
4,418
Location
Monroeville, PA
Getting ready to fill for my shop floor. Limestone is not a local material has to be trucked in, it's available for $26 a ton in number 57 washed. I can get local queried 57 washed for $12 a ton. I will be using 50 tons so the local gravel has some decent savings. The quarry said its crushed just concerned its not as angular as limestone I have used in the past. Will I have any issues consolidating it? I have a jumping jack and a plate compactor to use on it in multiple lifts.

If you are putting that down as a base for another material such as concrete it would be ok, but I'd choke it on top with some fine to keep concrete from settling inbetween the rocks. If you're using the rock as a floor I would look for some thing else then those round rocks.

Guess what I'm saying is what is your final goal for the floor?
 

jives

Well-known member
Joined
Jan 4, 2013
Messages
2,823
Location
Central NY
A good description from the concrete network:

https://www.concretenetwork.com/concrete-subgrades-subbases/

With that said, our 5" wire mesh reinforced slab (32 x 42, with control cuts) has not moved or cracked one bit in 5 years. We had to bring in 240 tons of bank run gravel to level the site, which was compacted by a heavy equipment multi-ton road roller in 5" lifts. A final layer of compacted crusher run was topped by a few inches of pea gravel. The pea gravel does not compact, but served as a capillary break. No problems whatsoever, likely because of the extreme compaction done to the subbase.
 

Glory

Well-known member
Joined
May 23, 2013
Messages
163
Always try to use what your local govt. specs for their roadway base. It’s been tested, it exceeds the engineering requirements and the gravel plants who are listed as “approved” by the DPW typically keep the consistency/quality high.

My advice, absolutely go for the limestone.

Compaction of subgrade and base is EVERYTHING.
 

hotrod1968

Banned
Joined
Jul 15, 2019
Messages
79
Location
oregon
Always try to use what your local govt. specs for their roadway base. It’s been tested, it exceeds the engineering requirements and the gravel plants who are listed as “approved” by the DPW typically keep the consistency/quality high.

My advice, absolutely go for the limestone.

Compaction of subgrade and base is EVERYTHING.
We haul 100s of thousands of tons of rock here in Oregon..... I can assure you a government spec is not always the best. Talk to your local contractor or concrete guy. ( many times a spec is called for by the government that in the real world would never be used forcing the tax payer to pay a much higher price for a product.)

Sent from my SM-G965U using Tapatalk
 
Last edited:
OP
P

plout99

Well-known member
Joined
Apr 8, 2012
Messages
288
Location
Ohio
The shop will have a floor planning to pour it by mid October maybe sooner. I used 304 for the driveway up to the shop and it packed great. My concern with usin something with fines is frost heave. The ground is clay and drys out so-so when it's wet. There is no concensus on the internet either, some say sand, or pea gravel or 57 or something with fines for fill. I have a BIL that is in the business and is going to help with the pour but he works in southern Florida and has no experience with frost heave. The slab will be 6" above grade on the low side and 14" above on the high side so could I put drainage tile around the perimeter like a house foundation and daylight it to get rid of any water?
 

Glory

Well-known member
Joined
May 23, 2013
Messages
163
We haul 100s of thousands of tons of rock here in Oregon..... I can assure you a government spec is not always the best. Talk to your local contractor or concrete guy. ( many times a spec is called for by the government that in the real world would never be used forcing the tax payer to pay a much higher price for a product.)

Sent from my SM-G965U using Tapatalk

I’ve worked for the largest engineering companies in the world, I’m currently on the largest transportation project in America 9.5B.
I can assure you that the local contractor or concrete guys know just enough to stay out of trouble, but sometimes they don’t even know that much.

Empirical vs. anecdotal, there is a difference...
 

hotrod1968

Banned
Joined
Jul 15, 2019
Messages
79
Location
oregon
I’ve worked for the largest engineering companies in the world, I’m currently on the largest transportation project in America 9.5B.

I can assure you that the local contractor or concrete guys know just enough to stay out of trouble, but sometimes they don’t even know that much.



Empirical vs. anecdotal, there is a difference...
Government never over specs things,over pays for things,engineers a **** product....its a shop floor you even going there makes my point....

Sent from my SM-G965U using Tapatalk
 