renjaminfrankln
Member
Pics attached. By the end of next week I should have my 18,000 BTU mini split installed, and everything cleaned out. The floor is the last step.
The slab is in good shape (level, smooth, no cracks) except for oil stains from that truck there. I just finished up a 3 month project on it, replacing the heads, turbo and exhaust, and while at it, I got all of the oil leaks.
Its a 550 SF two car garage. Will usually have the daily drivers in there, but I get busy with air tools and a floor jack from time to time. I'm sure oil/antifreeze will get spilled on it, but I will be good about cleaning up and I can be somewhat gentle with the floor jack and stands going forward
Lets say my budget for materials is around 1k. I'm open to anything from a good cleaning followed by a densifier/sealer, to a 2-3 day project with an expensive epoxy or polyurea kit.
What do ya think
The slab is in good shape (level, smooth, no cracks) except for oil stains from that truck there. I just finished up a 3 month project on it, replacing the heads, turbo and exhaust, and while at it, I got all of the oil leaks.
Its a 550 SF two car garage. Will usually have the daily drivers in there, but I get busy with air tools and a floor jack from time to time. I'm sure oil/antifreeze will get spilled on it, but I will be good about cleaning up and I can be somewhat gentle with the floor jack and stands going forward
Lets say my budget for materials is around 1k. I'm open to anything from a good cleaning followed by a densifier/sealer, to a 2-3 day project with an expensive epoxy or polyurea kit.
What do ya think
Attachments
Last edited:
