I have a 20x30 100+ year old barn that has half collapsed. It's timber framed. I'm getting estimates for demo and removal. I'm asking that they try to salvage the large cross beams if possible. The floor is dirt, so no concrete removal is required.
Does anyone have an idea of a rough estimate for work like this? My friend's father is in construction. He estimated it as a 1/2 day job.