Current issue:
I'm trying to decide if I should put (1) 18w x 10h door in the center or (2) 10 x 10 doors on my new garage/workshop?
After many years of planning and saving I'm finally getting ready to build.
Here are the basics:
Garage
33' wide x 54' deep (Approx. 1800 sf garage)
12 foot ceiling in garage
Upstairs
865 sf upper level with 9 ft ceiling. (Future office, storage, rec room...not 100% sure right now)
The drawing below is the first draft and is a 10ft ceiling in the garage and
8ft upstairs. This is being changed.
I'm also talking with the builder about putting at least a 10 ft wide door on the back so I can drive through it. I would like to make the stairs more efficient (spacewise) but don't really want to put them on the outside.
What I intend to do with the garage:
I have a couple of vintage cars and do a lot of welding/fabrication so I'm going to want a lift. The shape of the garage is somewhat dictated by the shape of our property.
Any ideas, suggestions, or feedback are welcome. I'm still in the planning stage.
I'm trying to decide if I should put (1) 18w x 10h door in the center or (2) 10 x 10 doors on my new garage/workshop?
After many years of planning and saving I'm finally getting ready to build.
Here are the basics:
Garage
33' wide x 54' deep (Approx. 1800 sf garage)
12 foot ceiling in garage
Upstairs
865 sf upper level with 9 ft ceiling. (Future office, storage, rec room...not 100% sure right now)
The drawing below is the first draft and is a 10ft ceiling in the garage and
8ft upstairs. This is being changed.
I'm also talking with the builder about putting at least a 10 ft wide door on the back so I can drive through it. I would like to make the stairs more efficient (spacewise) but don't really want to put them on the outside.
What I intend to do with the garage:
I have a couple of vintage cars and do a lot of welding/fabrication so I'm going to want a lift. The shape of the garage is somewhat dictated by the shape of our property.
Any ideas, suggestions, or feedback are welcome. I'm still in the planning stage.
Last edited:

