STIBuilder
Well-known member
In the planning and design phase of my one shot shop design. Its pretty much one the only shot im getting to get this right so getting as many idea's as I can. I plan on doing all the major work minus the concrete. So far its been a two year process to get the pad ready, and due to weather we are looking like another 5 - 6 months before we can finish the retaining wall.

Footprint, 40x64x16 with back room. The plan is to use 7/12 Storage trusses for the span with a 20ft shed dormer. We made some changes over the weekend to the plan, decided the fabrication room didnt need to be 12ft so made it 10ft to get to 3:12 roof, and changed the lean-to roof to be a hip roof to get it to 3:12 also.

We have a 650 ft run to get electrical to the building from the transformer so I can have a true 200 amp service. Hope to be past engineering and ready to submit for building plans by February first.


Footprint, 40x64x16 with back room. The plan is to use 7/12 Storage trusses for the span with a 20ft shed dormer. We made some changes over the weekend to the plan, decided the fabrication room didnt need to be 12ft so made it 10ft to get to 3:12 roof, and changed the lean-to roof to be a hip roof to get it to 3:12 also.

We have a 650 ft run to get electrical to the building from the transformer so I can have a true 200 amp service. Hope to be past engineering and ready to submit for building plans by February first.