I have a question for those of you who have done your own concrete work in the past. When you order concrete, what happens if you have concrete left over in the truck when you are done with your pour? I did the calculations and it came to 7.8 yards of concrete for what I need. If I order just 8 yards it will be a little too close for comfort with spillage and waste. If I order 8.5 or 9 yards I have a good chance of having concrete left over. I don't mind paying for extra concrete that I don't use but I don't really have a place to put it. Will the concrete company typically make you take the full load or will they dispose of the extra concrete back at their plant? Also, do they require you to have a place to wash out their barrell and cutes? Any suggestions on where to do this if so? I have washed out portable mixers before and wherever the water/concrete spilled it created a dead spot where no grass would grow. In the past I have used the mobile mix trucks so none of this has been an issue. This pour requires more concrete than the mobile mix guys can deliver so I am stuck with readymix. Any advise you can provide is appreciated.
Keith
Keith