Well-known member
Hi guys,
2 weeks into my garage build. I'll be ready to install my house wrap very soon and wondering on proper transition at bottom of the OSB. I've left the OSB 1/2 up from the slab to prevent moisture to wick up the sheathing. But now I'm wondering if I should tape over the sheathing and onto the concrete and then put my Tyvec over that to prevent rain splashing up onto the sheathing from under the vinyl siding. How do you guys deal with this? Pictures if you have them
Here's a picture of the garage so far. Just finished the roof last night before big rainstorm today:
2 weeks into my garage build. I'll be ready to install my house wrap very soon and wondering on proper transition at bottom of the OSB. I've left the OSB 1/2 up from the slab to prevent moisture to wick up the sheathing. But now I'm wondering if I should tape over the sheathing and onto the concrete and then put my Tyvec over that to prevent rain splashing up onto the sheathing from under the vinyl siding. How do you guys deal with this? Pictures if you have them
Here's a picture of the garage so far. Just finished the roof last night before big rainstorm today:
Attachments
Last edited: