Hey guys, we just bought a new house that came with a metal building/shop. Although it was poorly built, I've been working out the kinks (roof leaks, etc.) I'm gonna be getting it insulated soon with closed cell spray foam.
So here's a little info about the shop, then I'll get on with my question. The shop is 30ft wide (front and rear with 2 9x7 garage doors on the front), 24ft deep (both sides, with one regular doorway on the left hand side) 9ft corners, with a 12ft peak. The trusses and metal studs are spaced 5ft apart. Once it's insulated, I want to put up 7/16 OSB on the walls and the ceiling. Since the studs are spaced 5ft out, I was thinking of running 2x4s horizontally, mounted to the metal studs themselves with some kind of stout self tapping screws/bolts, probably on 24in centers. Then mount the OSB to the 2x4s. Does this plan sound decent? I'll attach a picture or two of my incredibly disorganized and messy shop (once I get the walls up, I can start organizing and building shelves, we just moved in and I've had other priorities
)
So here's a little info about the shop, then I'll get on with my question. The shop is 30ft wide (front and rear with 2 9x7 garage doors on the front), 24ft deep (both sides, with one regular doorway on the left hand side) 9ft corners, with a 12ft peak. The trusses and metal studs are spaced 5ft apart. Once it's insulated, I want to put up 7/16 OSB on the walls and the ceiling. Since the studs are spaced 5ft out, I was thinking of running 2x4s horizontally, mounted to the metal studs themselves with some kind of stout self tapping screws/bolts, probably on 24in centers. Then mount the OSB to the 2x4s. Does this plan sound decent? I'll attach a picture or two of my incredibly disorganized and messy shop (once I get the walls up, I can start organizing and building shelves, we just moved in and I've had other priorities

)

