That's odd, we have stacks of tracks here but have trouble getting the doors. I was down in our warehouse and we have lots of tracks. Not a door guy so I don't know if there are different kinds of tracks for different types of doors but they all look pretty similar to me.
I think specifically it is the particular radius the need for the high lift but who knows.
 
To avoid these ads, REGISTER NOW!

Chip03q9

Member
Joined
Dec 28, 2021
Messages
19
So I tried to order 2 custom size overhead doors back in May 21, and the box stores said the lead times were up to 12 weeks. I checked back in September and they said it's up to 14-17 weeks. I called around to the overhead door companies 2 weeks ago and nothings changed. They said it's not the panels, it's the hardware that comes from China. I thought maybe with the Texas, Florida, and Louisiana ports unloading now, maybe things would move along better. I guess not?? I'm surprized there's no one on this forum building a garage or shop this summer that hasn't mentioned this.
T
 
To avoid these ads, REGISTER NOW!

Chip03q9

Member
Joined
Dec 28, 2021
Messages
19
So I tried to order 2 custom size overhead doors back in May 21, and the box stores said the lead times were up to 12 weeks. I checked back in September and they said it's up to 14-17 weeks. I called around to the overhead door companies 2 weeks ago and nothings changed. They said it's not the panels, it's the hardware that comes from China. I thought maybe with the Texas, Florida, and Louisiana ports unloading now, maybe things would move along better. I guess not?? I'm surprized there's no one on this forum building a garage or shop this summer that hasn't mentioned this.
Two 12x12 doors orderd August 4 late November doors came in with no springs doors were installed so I could close building up to get framing electrical etc done still no springs have a backhoe and car in garage cannot move out side doors are to heavy to lift without springs glad I don't need backhoe are car.
 

haveissues

Well-known member
Joined
Feb 9, 2011
Messages
379
Location
Hudson Valley NY
I ordered my door in June and it took almost 6 months to the day to come in. Sounds like the springs were the last holdup. Instead of 2 large springs it was delivered with 4 shorter springs.
 