I am building my garage wall in sections. They are being built on the floor including sheathing then stood up. My first wall is 16' long. It will have a double bottom plate and a double top plate. The sheathing will be attached to both.
Do I need to overlap my wall sections with the OSB sheathing? I have 3 rows of sheathing. The bottom row is 2 8' pieces, the second row is a 4'-8'-8' (or 4' depending on the answer), the third row is 8'-8'. My next section will be another 16' wall.
While I understand the advantages overlaping the sheathing between walls, the 4' piece hanging over the middle of the row will effectively create a sail on my first wall while I wait to build the next section. It could be a week or more before I get the next section up. It also make it hard to put the housewrap on the section.
Thoughts?
Do I need to overlap my wall sections with the OSB sheathing? I have 3 rows of sheathing. The bottom row is 2 8' pieces, the second row is a 4'-8'-8' (or 4' depending on the answer), the third row is 8'-8'. My next section will be another 16' wall.
While I understand the advantages overlaping the sheathing between walls, the 4' piece hanging over the middle of the row will effectively create a sail on my first wall while I wait to build the next section. It could be a week or more before I get the next section up. It also make it hard to put the housewrap on the section.
Thoughts?