Been busy times, too much bandwidth used at work which means not enough left for shop. It's been a trying time, but am finding as the weather gets nicer I'm spending more and more time out in the shop. And looking to ensure I continue!
Mostly tackling electrical, added a 50A welding plug (along with the existing 30A one), a few standard 20A outlets and wired up the Pratt & Whitney Model C.
Enough to keep me busy. Ended up feeding the lathe overhead, so I could create another "aisle" in the working area of the shop.
Also ran 4 CAT6 lines through the underground conduit to the house, and got them all terminated and connected to the switch there. Lo and behold I have a wired connection for my mesh node now, and can use wifi with the door closed, lol. This location is temporary for the node, but I haven't done any of the CAT6 hardlines in the shop yet. Will run those to the CNC router, future office space and the shop floor computer spot at minimum.
And finally, added a shop TV I had laying around. I actually think this will increase my productivity (if today is any indication) out in the shop, rather than reduce it. Just means I can spend hockey games out here working and catch it all, rather than sitting in the living room. It's been 8 years since I had a shop TV, and it was great at that time! So far it's been well worth the effort.
A bit more wall painting to do still now that I put the last couple sheets of plywood up. Then I'll install the other speaker and have a few hundred more watts of sound system at my disposal.