billconner
Well-known member
I have a under ground for a sub panel in a detached building. It's an Uber, no. 4 copper, rising to panel through block cores and then less than a foot to panel.
Should I run it through a knockout with a 2 screw (Romex) clamp, a bushing, or bare? Seems no clear code language.
Should I run it through a knockout with a 2 screw (Romex) clamp, a bushing, or bare? Seems no clear code language.
