I'm working on partitioning out a 15x30 foot shop in our existing 30x60 barn. The shop will be heated in the winter. The remaining floor space in the barn will not be heated. The floor in the barn is a 4" poured concrete floor. During a very harsh winter last year, I definitely had some heaving in the floor. Should I be cutting the concrete through to "float" the cold and heated sections of pad independently? This would in effect create a 15x30 heated pad and a 45x30 unheated pad. Make sense? Or am I over thinking this?
Thanks!
Brian
Thanks!
Brian