MushCreek
Well-known member
I'm replacing the rusted out floors in my '72 F-250. I bought the individual pans, and cut out the old, and am welding in the new. The question is this- Do I have to have weld bead all around, 100%? Because of the thin metal, I'm just doing zillions of tiny beads. I'd say I'm at 60% filled in. Do I need to get all of it, or can I just cover it in seam sealer and call it done? It's plenty strong at this point. I'm not building a show truck, just a driver.