I’m going to add a lean to type patio cover to my house and have a few questions. I’m planning on building a 18’ deep x 24’ lean to type open rafter patio cover that will be connected to the house on one end and running out and sitting on a 4x12x24 beam that will be supported by 3 8x8 cypress post 15’ out from the house. The roofing is going to be 29ga tin . Questions #1 Will 2x8x18 rafter on 16” centers be ok. #2 My plan is to use 2x4 pulins with 29ga tin but I’m worried by the heat from the sun on the bare tin underside making it fill let and oven, has anyone every use a heat barrier material under the tin or would it be better to put down something like bead board , tongue and grove ,then the tin on top. If I go with tongue and grove do I need to put something else on top to have enough wood for the tin screws to screw to. #3 What’s everyone thoughts with putting the post in the ground with concrete. The reason for asking this is I’m planning on sitting the post then after they setup notching the post and sitting the beam in the post. So putting them in the ground I’d have more control with getting the notches perfect. #4 Whats the best screws to use for attaching the ledger board the the house. Do I need the use lag screws or would timberlok screws be ok. The ledger board will attach to a beam in the house.
Thanks
Thanks