I installed an electric vehicle charger in my garage myself. It was a fairly simple process; just surface-mounted conduit, and a wire run of 25 feet to the EV charger.
I've never had an inspection done before; what should I expect? Do I leave the subpanel cover off, junction box covers off, and take off the main cover of the EV charger? Are they going to get really in to the weeds with measuring conduit strap spacing? Anything else I need to "watch out" for?
I'm also curious if they'll check stuff like ground rods on the subpanel. They're there, just buried in the yard, so I'm not sure if they need to be exposed.
I've never had an inspection done before; what should I expect? Do I leave the subpanel cover off, junction box covers off, and take off the main cover of the EV charger? Are they going to get really in to the weeds with measuring conduit strap spacing? Anything else I need to "watch out" for?
I'm also curious if they'll check stuff like ground rods on the subpanel. They're there, just buried in the yard, so I'm not sure if they need to be exposed.