kert
Well-known member
Have a contractor bidding my 30x60 slab and wants to do it in 3 sections. Is there any problem with multiple pours over PEX? The PEX could probably be laid out to minimize the number of crossings, but should I be concerned about the tubing failing at the joints? I suppose I cold even put in 3 manifolds so that the lines don't cross the joints.