I think I made a terrible mistake. Hopefully someone can help me out with some advise. Okay here's the deal;
I have a detached 24x28 garage sitting on a full foundation. I placed 3" pvc conduit before foundation was poured. Now I want to run my pex through my conduit which goes through foundation wall (36" down) then 90's up through floor. I'm running 1" Pex out to the garage. Anyone see my problem yet? No way 1" pex is going through a 3" pvc 90. Now what do I do. As I'm writing this I realize that I don't need to go in with the 1". I could reduce it although I will then have a connection underground. Anyone think I could get 1/2 through it or maybe 3/4? Any suggestions? What would have been the proper way to get the water in?
I have a detached 24x28 garage sitting on a full foundation. I placed 3" pvc conduit before foundation was poured. Now I want to run my pex through my conduit which goes through foundation wall (36" down) then 90's up through floor. I'm running 1" Pex out to the garage. Anyone see my problem yet? No way 1" pex is going through a 3" pvc 90. Now what do I do. As I'm writing this I realize that I don't need to go in with the 1". I could reduce it although I will then have a connection underground. Anyone think I could get 1/2 through it or maybe 3/4? Any suggestions? What would have been the proper way to get the water in?
Last edited: