My daughter and family are building a new home in Dry Creek area of Healdsburg California. Property was unimproved so has required septic, propane tank, and well pump in existing well head, and of course power. Process and permitting has been slow but PG&E is downright glacial, in spite of them being pushed by the electrical contractor, (Summit Technology). Of course this has resulted in on site generators for construction and for power to run the new well pumps. It is a straight run underground for about 300 feet from an existing pole line. Transformer pad and terminating facilities have long been in place, just waiting for that last 300 feet!
There will be main house, a granny unit, barn/garage, and pool. Provision is being made for solar as well as back up generator on propane. Granny and pool are nearing completion, so power would sure be nice to have. Lesson here is assume PG&E will be late to the party; they have not been humbled by all the litigation.

There will be main house, a granny unit, barn/garage, and pool. Provision is being made for solar as well as back up generator on propane. Granny and pool are nearing completion, so power would sure be nice to have. Lesson here is assume PG&E will be late to the party; they have not been humbled by all the litigation.