i have a 24"x8" grade beam on 30' piles with no key way. I plan on doweling 15m rebar into the beam so the floor ties into the grade beam
i also have 3 piles in the middle of the floor with 5'x5' caps for the floor to sit on
does this sound like a viable option for a structural slab or should i bolt on angle iron onto the grade beam instead
thanks