Thedroid
Well-known member
Does anybody have take off chart or method that's easy to reference when doing the occasional pipe job. I plan and run around 1000 ft of pipe per year, and would like to know some of the tricks rather than flying seat of the pants. I usually measure face to face and then add on the max thread engagement times 2. Is there a better way. How is it done center to center?