From what I can tell the standard floor in this area (Eastern Mass) is 3000psi reinforced 4 inch concrete. I may put a MaxJax lift in at some point so I am going to spec thicker. Five inch or six?

If I plan coat the floor with epoxy should skip the sealing process? Its getting into the cold months and the epoxy needs 50 min temps. Should leave the floor unsealed and coat the floor in the spring and try not to get it greasy over the winter?

Steve
 
To avoid these ads, REGISTER NOW!

LegacyIndustrial

ALLIANCE MEMBER
Joined
Jun 7, 2010
Messages
7,994
Location
deerfield, IL
From what I can tell the standard floor in this area (Eastern Mass) is 3000psi reinforced 4 inch concrete. I may put a MaxJax lift in at some point so I am going to spec thicker. Five inch or six?

If I plan coat the floor with epoxy should skip the sealing process? Its getting into the cold months and the epoxy needs 50 min temps. Should leave the floor unsealed and coat the floor in the spring and try not to get it greasy over the winter?

Steve

Steve:

You could apply a clear sealer to protect until the Spring, then grind off easily.

or...

You could go with a polyapsartic coating, good into the teens.

or...

You could wait until Spring and be careful. :)
 