I have been trying to study everything I need to know in order to feed power to my new shop but with all the info, my head is spinning. I’m hoping some experts can lend a hand. I will attempt to be as specific as possible here.
I have 200 amp service with a Square D Homeline panel in my home. The wall where my main panel is, is not yet drywalled. I would prefer not to need conduit inside either structure, and do not want to splice the feeder.
Can I simply come from the main, through the wall of the house directly into conduit, down into the ground, then a 90 toward the shop, straight run of conduit less than 20’ to the back wall of the shop, another 90 up the wall of the shop and through the wall to the Square D 100 amp sub panel?
Will this wire coupled with a 90amp CB in the main allow me to accomplish all of this correctly and safely?
https://www.wireandcableyourway.com/4-3c-thhn-pvc-tray-cable-with-ground.html
Greatly appreciate the help
I have 200 amp service with a Square D Homeline panel in my home. The wall where my main panel is, is not yet drywalled. I would prefer not to need conduit inside either structure, and do not want to splice the feeder.
Can I simply come from the main, through the wall of the house directly into conduit, down into the ground, then a 90 toward the shop, straight run of conduit less than 20’ to the back wall of the shop, another 90 up the wall of the shop and through the wall to the Square D 100 amp sub panel?
Will this wire coupled with a 90amp CB in the main allow me to accomplish all of this correctly and safely?
https://www.wireandcableyourway.com/4-3c-thhn-pvc-tray-cable-with-ground.html
Greatly appreciate the help