IPACA9
Well-known member
Hey plumber guys I'm finally getting around to adding my bathroom under my mezzanine. It's been two years since we replaced our septic system and had a line and water run to the back corner of my shop. I'm using a rear outlet pressure assist toilet that will exit a elbow so I don't have to tear up my slab. My question is my plumbing layout. I'd like to go with a Air Admittance Valve or Studor vent instead of going up through my roof. In my drawing I added them in different areas for options. Would I be fine with just the vent for the sink or would it be better to have more than one?



















