I am planning to build a pole barn for tractors and farm tool storage and insulated wood shop. I originally planned to build an open pole barn for my farm storage and a separate building on concrete piers with a wood floor foundation. Then decided if I could combine the two it would be cheaper mainly in using an existing concrete for the floor of the wood shop and not doing a wood floor. I have an old rotten falling in barn over a big rough poured concrete slab. I want to tear the old barn down and use the concrete slab. It looks on one side like it may be 3-4" thick and on the other side its level with the ground. So I don't know if it tapers down thin on that side or if the ground is just filled in so its up level. Anyway, the concrete is not at all level and pretty rough so building walls on the edge is not really an option. The edges in some areas are not straight and break away in some spots. Its about 22 feet wide and probably 70' feet long. Longer than I need it to be. So I was thinking of doing 6x6 treated edge poles in the the ground about 24' wide and one row of poles in the center. I'll build it with no wall in the front across the width leaving it open for backing in tractor, horse trailer and some equipment. Then a wall behind all that starting into the woodshop area. I want the wood shop to have insulated walls and will probably put a ceiling and small attic area with insulation so I dont have to insulate in the roof rafters. Now for the question. I want to make sure I dont have any water running in along the base of the walls and need to make sure the wood walls and insulation don't soak up any water. Can I just screw two 2x6's against the poles one on the inside and one on the outside of the poles against the ground to pour a small 6" tall concrete wall between the poles and then place a treated 2x6 on top of it to be my bottom wall plate and then frame up 2x6 walls between the poles? It seems that way my walls and insulation would be off the ground and have somewhat of a seal against the ground. after pouring the short concrete wall I would just remove the 2x6 form boards against the sides of the poles and pour a little concrete on the ground to bridge the gap between my old rough edge slab and my concrete short wall between the posts. I know that concrete breathes and would allow some humidity to move in and out. And I don't think that would be a problem. It's not a house or anything. I just don't want any water to be able to seep in or have my walls right on the ground where the wood could deteriorate or cause my insulate to be damp. By the way there is decent water run off away from the building. I wouldn't have standing water on the outside of the concrete wall or anything that would be likely to let water in if it ever cracks a little or anything. So will this plan work? Will the wall stay good and dry? And what kind of prep on the ground would be needed to pour this wall between the posts and on the ground connecting to my slab? Just removing grass and debris smooth out the dirt, level it some and pack it down? any info would be greatly appreciated!