wingrider02
Well-known member
Hello All,
My pole barn is getting close to completion. For reference, I am building a 40x56’ with 12’ceiling. I plan to put 5” concrete over plastic, foam, and pex tubing. My base is 4-5” of class 5 gravel, and below that is clay seemingly down to the core of the earth.
I had a neighbor stop by that does concrete, and he offered a bid to do the slab, finished with saw cuts. It would be reinforced concrete. Quoted 8K for all.
I had asked about rebar, and his response poses my question. He stated that the reinforcement in the concrete takes the place of the rebar.
Does that sound correct? The only things I know about concrete is it gets hard, and cracks.
I will include a picture of where the progress is.
Thanks for any help!
My pole barn is getting close to completion. For reference, I am building a 40x56’ with 12’ceiling. I plan to put 5” concrete over plastic, foam, and pex tubing. My base is 4-5” of class 5 gravel, and below that is clay seemingly down to the core of the earth.
I had a neighbor stop by that does concrete, and he offered a bid to do the slab, finished with saw cuts. It would be reinforced concrete. Quoted 8K for all.
I had asked about rebar, and his response poses my question. He stated that the reinforcement in the concrete takes the place of the rebar.
Does that sound correct? The only things I know about concrete is it gets hard, and cracks.
I will include a picture of where the progress is.
Thanks for any help!
