dodge em
Active member
I am having a guy build me a pole barn. He wanted me to do the holes because there is a unmarketable gas well line on the property. So i did them sunday with inspection for monday. Code is 5ft 24in wide. 24" 12"d footer brings post 4ft under.
A unannounced rain storm filled 15 holes 1/2 full of slurry sunday night.
So contractor came and sholved most of it out and put quick crete in. The tops are at 4ft below grade.
I have no idea how much concrete he did, what if all the silk is not all out? He called inspector and some how at 4ft and not the supposed to be 5ft it passed.
Looking for what you would do.
Orginal plan was redi mix truck was supposed to deliver 1.75 yards and do the job.
A unannounced rain storm filled 15 holes 1/2 full of slurry sunday night.
So contractor came and sholved most of it out and put quick crete in. The tops are at 4ft below grade.
I have no idea how much concrete he did, what if all the silk is not all out? He called inspector and some how at 4ft and not the supposed to be 5ft it passed.
Looking for what you would do.
Orginal plan was redi mix truck was supposed to deliver 1.75 yards and do the job.
Last edited: