Stem wall is poured for a new building. Should I go ahead and put in the down spout drains now or wait until after the building is complete?
If I do it now how far off the corner of the foundation should the drains be? And how far away from the foundation? Just want to make sure I have it right to prevebt doing it twice.
Building is a 48x64. Downspout in each corner. Connecting two drains together into 4" sdr11 on each side.
If I do it now how far off the corner of the foundation should the drains be? And how far away from the foundation? Just want to make sure I have it right to prevebt doing it twice.
Building is a 48x64. Downspout in each corner. Connecting two drains together into 4" sdr11 on each side.