I am trying to draw up a plan so I can pull a permit to run a feeder to my pole barn and have a few questions.
I am trenching in 2" pvc conduit, total of 200 feet with 2 45's in the mix to feed 2-2-2-4 use-2 aluminum in it.
I plan to feed it with a 50 amp breaker to a 100 amp breaker in the barn panel.
Can I use a 2" LB to splice the use-2 to #4 thhn on each end to go into the buildings or wil I need junction boxes?
Is there a certain height from grade for the LB to enter the buildings?
The barn panel will be 12' lower in elevation than the house panel, will this be an issue using conduit?
I'm sure I will have more questions once I get going on this..
Thanks
I am trenching in 2" pvc conduit, total of 200 feet with 2 45's in the mix to feed 2-2-2-4 use-2 aluminum in it.
I plan to feed it with a 50 amp breaker to a 100 amp breaker in the barn panel.
Can I use a 2" LB to splice the use-2 to #4 thhn on each end to go into the buildings or wil I need junction boxes?
Is there a certain height from grade for the LB to enter the buildings?
The barn panel will be 12' lower in elevation than the house panel, will this be an issue using conduit?
I'm sure I will have more questions once I get going on this..
Thanks