I'm having a 36x48x16 pol barn built currently. It's being built with 6x6 PT posts 12ft apart on center, with 2x6 bookshelf girts blocked in between. After the crew left yesterday I looked at it and saw a possible red flag. They notched the end posts out and fastened the truss to the post. On the second bay in, they simply laid the truss on the top 2x6 girt, butted the truss up to the post and fastened it to the post. I have never seen that done. Shouldn't there be a top header plate going around the building set into the posts by notching every post, then attach trusses on top of the headers using hurricane brackets?
Thanks, and I apologize if I'm using incorrect terminology.