I plan to set 16' PT poles for the pole barn I am going to build. To get max height can I set these 16' poles 2' deep pour concrete around them and tie them into the pad with re-bar run through them? Is this too shallow to set these posts?
I figure they will be susceptible to tipping until they are all tied together at the tops with a doubled up 2x10" but then they should be as structurally stiff as they need to be. And as long as they are tied to the pad when it is poured, there should be no problem with uplift.
What do you all think?
Tom
I figure they will be susceptible to tipping until they are all tied together at the tops with a doubled up 2x10" but then they should be as structurally stiff as they need to be. And as long as they are tied to the pad when it is poured, there should be no problem with uplift.
What do you all think?