This isn't my photo just one I found on the net sow it not the exactly project.
Sow to my question, If I filled in the space above the 2x6 with plywood and run wire along the roof line stapled to plywood could I with in code go around the 4x6 and over top of the truss? I think it could be bundling and might have a problem with that. what do you think? The black lines in photo is where I would like to run the wire.
Sow to my question, If I filled in the space above the 2x6 with plywood and run wire along the roof line stapled to plywood could I with in code go around the 4x6 and over top of the truss? I think it could be bundling and might have a problem with that. what do you think? The black lines in photo is where I would like to run the wire.