Captain Spaulding
Well-known member
Planning a new barn for storage, and I've already got the flat part of the property full. I was wanting to run 50ft length, but the lay of the land means I'll need 36" of fill at one end for a level floor.
Some builders are saying I need a stem wall or to form a wall between posts to hold the fill in place on the low end. Others say the boards will hold it if I fill with 53s or 73s.
Anybody got any input? One builder quoted about $5000 for the wall. Seems like a lot. I already have a building with 23" of fill at one end that is 19 years old with no issues.