HI all, newbie here......not new to the construction scene. Do a lot of home projects, but never built a house or large structure before!!
I have been pricing 40x60x16 pole sheds, and have it narrowed down to a good builder for a good price. The structure itself with (9) 4x3 insulated sliding windows, 2 walk in doors, and a 16x10 OHD installed, with 5" concrete is about $44,000.
Last night my cousin called me.....said I should just stick build it, this way I can do it myself, it'll be stronger, easier to insulate, etc. So I go on Menards side and start calculating building this with 2x6 walls, 16 o.c., with the same window and door configuration. I come up with about $11,500 for materials, including trusses 2' o.c., 7/16" osb sheeting on walls and roof, 15lb felt on roof, and sheet metal on the entire building. I am certain the concrete slab will be more $$ due to the footers and additional excavation.
Is there something I am missing here? I was always told stick built was so much more $$ than pole barn? When I factor in the additional materials and such to frame out the inside for insulation and finishing the walls with metal, I just keep adding more money to the pole barn project, and wondering if stick built is a better option?
Would just like to hear from those more knowledgeable in this area, as I am not an expert by any means!!!
Appreciate any feedback.
Frank
I have been pricing 40x60x16 pole sheds, and have it narrowed down to a good builder for a good price. The structure itself with (9) 4x3 insulated sliding windows, 2 walk in doors, and a 16x10 OHD installed, with 5" concrete is about $44,000.
Last night my cousin called me.....said I should just stick build it, this way I can do it myself, it'll be stronger, easier to insulate, etc. So I go on Menards side and start calculating building this with 2x6 walls, 16 o.c., with the same window and door configuration. I come up with about $11,500 for materials, including trusses 2' o.c., 7/16" osb sheeting on walls and roof, 15lb felt on roof, and sheet metal on the entire building. I am certain the concrete slab will be more $$ due to the footers and additional excavation.
Is there something I am missing here? I was always told stick built was so much more $$ than pole barn? When I factor in the additional materials and such to frame out the inside for insulation and finishing the walls with metal, I just keep adding more money to the pole barn project, and wondering if stick built is a better option?
Would just like to hear from those more knowledgeable in this area, as I am not an expert by any means!!!
Appreciate any feedback.
Frank