Well-known member
I scored 3 rolls of vinyl faced 4in x 6ft x 75ft insulation off Craigslist for cheap. This stuff is usually $300/roll and I paid $50ea. My goal is no condensation rain, not R30. I fire up the torpedo if I have a big project, but mainly use the existinginsulated work room with the wood stove for small projects in the winter.
My pole barn is already built, roofs on, etc. So how do I install this? My trusses are on 10ft centers with 2x4 purlins that are on 2ft centers. The old part of the shop is 24x40 with a 12x40 closed in leanto across the back. So I'm thinking cut this into 6x10 bats that I run parallel to my purlins and then tape the seams so I would need 6 batts per bay or 24 total.
My concern is if I hang this under the purlins using cap nails with the purlins on 2ft centers the insulation will not fluff enough to fill the cavities between the purlins. Is this an issue? DO I need to put other batts (no money for this right now) between the purlins? Then roll the vinyl faced over the purlins?
Are cap nails the way to go? I can source nylon webbing used for hanging flex duct locally. Will the strapping hold up over time? I was thinking to use the nylon strapping with the cap nails.
Looking around online I also see steel strapping used. Would I be better off to use the steel strapping? If i used the steel I could run it at the bottom of the 2x6 that is the top chord of the truss and just lay the batts like a blanket on top of the strapping. But will the strapping span 10ft with out sagging? I could run a 2x2 perpendicular to the purlins in line with the trusses at 5ft and make the batts 5x6 not 10x6 so the strapping is only spanning 5ft?
My pole barn is already built, roofs on, etc. So how do I install this? My trusses are on 10ft centers with 2x4 purlins that are on 2ft centers. The old part of the shop is 24x40 with a 12x40 closed in leanto across the back. So I'm thinking cut this into 6x10 bats that I run parallel to my purlins and then tape the seams so I would need 6 batts per bay or 24 total.
My concern is if I hang this under the purlins using cap nails with the purlins on 2ft centers the insulation will not fluff enough to fill the cavities between the purlins. Is this an issue? DO I need to put other batts (no money for this right now) between the purlins? Then roll the vinyl faced over the purlins?
Are cap nails the way to go? I can source nylon webbing used for hanging flex duct locally. Will the strapping hold up over time? I was thinking to use the nylon strapping with the cap nails.
Looking around online I also see steel strapping used. Would I be better off to use the steel strapping? If i used the steel I could run it at the bottom of the 2x6 that is the top chord of the truss and just lay the batts like a blanket on top of the strapping. But will the strapping span 10ft with out sagging? I could run a 2x2 perpendicular to the purlins in line with the trusses at 5ft and make the batts 5x6 not 10x6 so the strapping is only spanning 5ft?