Post-Epoxy Control Joint Cleaning

Doug_Fir

Member
Joined
May 11, 2009
Messages
9
I chose to honor the control joints (caulk them after the epoxy) and to prevent the epoxy from filling the joint, I pushed in some backer rod at the surface, where the epoxy just barely covered it. I didn't clean the joints out between the different epoxy layers (primer, base/chips, clear epoxy and UV coats), and now I'm trying to cut open and clean the joints. I thought this would be easy, but it's not. The topcoat was installed less than 24 hours ago, and cutting with a razor blade isn't working. I've tried the Dremel tool, but it's slow going. What's the best way to clean these joints?

For those of you who honor the control joints, should I be cleaning the joints before installing the next layer, or is my toolbox just missing the right post-install technique?
 