bagged89s10
Well-known member
I’ve been trying to find more info online but have not found any good info.
I’m building a 24x34 or 24x36 post frame garage in Connecticut. 24ft will be the truss span. I plan on putting posts a maximum of 8ft apart. The garage doors will be on the eave side. The footings will have to go a minimum 42” deep to the frost line. Speaking with the last concrete contractor, he recommends digging 52” so the 10” thick is below the frost line. I want 24” diameter footings.
I plan to use sturdi wall wet set swp66 brackets for 6x6 posts. I was originally worried about not having enough time to set them when the concrete is poured so I might layout a jig so after that concrete piers are poured I can just quickly install the brackets with little measuring.
The question is, what diameter piers should I be pouring?
I’m building a 24x34 or 24x36 post frame garage in Connecticut. 24ft will be the truss span. I plan on putting posts a maximum of 8ft apart. The garage doors will be on the eave side. The footings will have to go a minimum 42” deep to the frost line. Speaking with the last concrete contractor, he recommends digging 52” so the 10” thick is below the frost line. I want 24” diameter footings.
I plan to use sturdi wall wet set swp66 brackets for 6x6 posts. I was originally worried about not having enough time to set them when the concrete is poured so I might layout a jig so after that concrete piers are poured I can just quickly install the brackets with little measuring.
The question is, what diameter piers should I be pouring?