Mattchew
Member
Thought I’d share my heater project I started a couple of weeks ago which took me only around 20 years to get to!
I originally grabbed half a dozen semi trailer brake drums off my old boss which have been sitting in my back yard for a few years, then I came across some drums off a 6x6 MAN service truck at work which are quite a bit larger than the other drums.
Welding cast steel can be a pain so I wanted to make this with no welding required at all on the drums and easy to dismantle coz it’s going to be real heavy.
Started with bending 32mm x 3mm flat bar to join the drums together.
Next came the ash box which I made out of these old stainless electrical cabinets, there was literally hundreds of these at my work being sent to the scrap yard so I took a few home.
Cut the front off two cabinets, shortened the width of one, trimmed the height and welded the front back on. Nice and easy to empty the ash.
Next challenge was putting legs on it. I cut a hole in some 10mm plate and cut it a little wider then my ashbox to weld the legs to. Tapered the legs just for looks.
I made use of the holes in the back where the eletrical wires went through and made a sliding door to regulate air flow.
Work still in progress so more to come soon.
I originally grabbed half a dozen semi trailer brake drums off my old boss which have been sitting in my back yard for a few years, then I came across some drums off a 6x6 MAN service truck at work which are quite a bit larger than the other drums.
Welding cast steel can be a pain so I wanted to make this with no welding required at all on the drums and easy to dismantle coz it’s going to be real heavy.
Started with bending 32mm x 3mm flat bar to join the drums together.
Next came the ash box which I made out of these old stainless electrical cabinets, there was literally hundreds of these at my work being sent to the scrap yard so I took a few home.
Cut the front off two cabinets, shortened the width of one, trimmed the height and welded the front back on. Nice and easy to empty the ash.
Next challenge was putting legs on it. I cut a hole in some 10mm plate and cut it a little wider then my ashbox to weld the legs to. Tapered the legs just for looks.
I made use of the holes in the back where the eletrical wires went through and made a sliding door to regulate air flow.
Work still in progress so more to come soon.


