fred d
Well-known member
I have a 20x24 garage
Looking at tearing it down and building a 40x30 building.
Is it a bad idea to use the existing slab as part of the 40x30, or should we demo up the old slab and just pour 1 complete
Could cut the concrete cost by about 40%
Looking at tearing it down and building a 40x30 building.
Is it a bad idea to use the existing slab as part of the 40x30, or should we demo up the old slab and just pour 1 complete
Could cut the concrete cost by about 40%