neveradullmoment
Active member
I have a 13'x21' out building that has poured concrete walls that the earth has built up around over the last 70 years and now gets water on floor in the spring and after heavy rains. I use it as a little work shop. It has 100" of head room inside now. I would like to add 1 or 2 inches of rigid Styrofoam and 4-5 inches of concrete to elevate the floor and eliminate my water problems. I heat the little workshop in winter so that's why I think adding the Styrofoam would help with the cold concrte in the winter? Is it as straightforward as laying down the styrofoam and backing up the cement truck? Thanks for any suggestions.

