I am building a 28' x 32' garage and just had all the site work completed here in Maine. From what I understand, I need to provide my town office with an application and drawings of my building plans and measurements of all my setbacks so that they can issue me a building permit. The builder I was planning on using is not returning my calls and I need drawings to get a permit. Since the builder is not retuning my calls, I decided to get started on my own. Does anyone know if I can pour my slab before getting a building permit? I was thinking I would have the slab poured and then tell the town that I would like to build a garage on my existing slab. Can I do this?